The step everyone skips. The one that matters.
Every good heat pump starts with a real heat loss survey. MCS-compliant, BS EN 12831, room-by-room. £250, refunded against the install.
Heat pumps only work when they're the right size.
The failures you hear about — noisy, expensive, cold — almost always trace back to a system sized on a spreadsheet instead of a survey. One bad number upstream infects every decision downstream.
- Correctly sized heat pump — no short-cycling
- Radiators specified for your chosen flow temperature
- Real running cost projection for your property
- MCS-compliant — required for the £7,500 BUS grant
- Insulation priorities with known payback
- Window types, areas and glazing
- Wall construction (solid, cavity, insulated)
- Roof and loft insulation depth
- Ventilation and air-tightness
- Floor construction and insulation
- Thermal bridging at junctions
Six steps. Every survey, every time.
Type, age, orientation, exposure. Ten-minute orientation before measurements begin.
Walls, loft, floor, windows, draughts. We borescope cavities when we can't see them.
Every room. Dimensions, window area, external wall area, ceiling heights. Nothing estimated.
MCS-approved software. Design day is -2°C for Staffordshire. Results per room, in watts.
At your chosen flow temp (typically 45°C for HP). Each rad sized for its room's heat loss.
PDF you keep. Heat pump sized. Radiator schedule. Running costs. Insulation priorities.
The survey is step one. Here's what comes next.
Once the numbers are in, we design the full system — right heat pump, right radiators, right controls — and file the BUS grant paperwork on your behalf.
- 1Heat loss survey · you are hereYou're here
- 2System design
- 3BUS grant application
- 4Install & commission
Heat loss surveys, answered.
Know your numbers. Then decide.
£250 for a comprehensive survey. Refunded in full against the install.